• Natural Gas News

    QCLNG Ships First Gas from Train 2

    old

Summary

BG Group on Monday announced it has started up and loaded its first LNG from the second production train at the Queensland Curtis LNG (QCLNG) facility in Australia.

by: shardul

Posted in:

Asia/Oceania

QCLNG Ships First Gas from Train 2

BG Group on Monday announced it has started up and loaded its first LNG from the second production train at the Queensland Curtis LNG (QCLNG) facility in Australia.

The first LNG from Train 2 set sail on the Maran Gas Posidonia.

At plateau production, expected mid-2016, both trains at QCLNG will be producing enough LNG to load ten vessels per month combined, exporting around eight million tonnes per year, the company stated.

Since production from the first train commenced in December 2014, 27 cargoes have been shipped.

BG Group began commercial operations in May 2015, when control of Train 1 formally transferred to QGC, BG Group's Australian subsidiary, from the constructor Bechtel Australia. Train 2 commercial operations will begin once a similar commissioning process has been completed.