• Natural Gas News

    Oz APLNG Plans Maintenance for Jul-Sep

Summary

Australia Pacific LNG (APLNG) has told the Australian Energy Market Operator (AEMO) that it will be undergoing periods of maintenance works throughout July, August and September with each one limiting half of one train of the two-train facility’s capacity.

by: Nathan Richardson

Posted in:

Natural Gas & LNG News, Asia/Oceania, Corporate, Exploration & Production, Infrastructure, Liquefied Natural Gas (LNG), News By Country, Australia

Oz APLNG Plans Maintenance for Jul-Sep

Australia Pacific LNG (APLNG) has told the Australian Energy Market Operator (AEMO) that it will be undergoing periods of maintenance works throughout July, August and September with each one limiting half of one train of the two-train facility’s capacity.

The works will run from July 17-22, August 21-26 and September 11-17, the note to AEMO said June 7.

APLNG is a 9mn metric tons/year capacity terminal. ConocoPhillips and Origin Energy each hold 37.5% interests and Sinopec has a 25% stake.

The facility is based on the east coast of Australia in the state of Queensland at the Port of Gladstone.